
Horace Mann Insurance Company
Springfield, IL
Aging Pneumatics Out — 10x the Savings In
Horace Mann planned to invest in LEDs, window replacements, and solar panels, but an energy audit revealed the real issue: a failing pneumatic system and inefficient mechanical design. A full controls upgrade delivered far greater savings, faster ROI, and major comfort improvements.
University of Illinois Springfield (UIS)
Springfield, IL
Comfort Maintained. Costs Reduced.
By upgrading to Campus Optimizer, UIS shifted a long-standing status quo into a data-driven, cost-saving operation—without sacrificing comfort.


Calvary United Methodist Church
Bloomington, IL
Efficiency That Paid Off Fast
After discovering year-round gas use and sky-high utility bills, Calvary UMC partnered with Alpha. With two major system upgrades and the help of a responsive team, Calvary slashed energy use, modernized operations, and saved tens of thousands of dollars annually.
Effingham Public Library
Effingham, IL
From Moldy Books to Budget Relief
Humidity issues and rising utility costs were draining this library's resources—until an integrated building controls system changed everything.


Ogle County Government
Ogle County, IL
Pardon Our Dust
This portion of the website is under construction, so please pardon our dust.
Harlem School District 122
Winnebago County, IL
Smarter Schedules, Lower Costs
Harlem School District noticed HVAC systems were running even when no one was in the building. Since implementing Alpha’s solution—especially Campus Optimizer—they’ve seen consistent energy savings, better temperature control, and have spent less time adjusting schedules.


University of Illinois Urbana-Champaign (UIUC)
Champaign, IL
Pardon Our Dust
This portion of the website is under construction, so please pardon our dust.
Illinois Great Rivers Conference Center of the United Methodist Church
Springfield, IL
Goodbye Duct Tape, Hello Efficiency
IL Great Rivers UMC had a failing 20-year-old HVAC system. After a total system freeze, they turned to Alpha for a full upgrade. The result? A more comfortable building, better control, and tens of thousands in annual energy savings.


DeKalb Community Unit School District 428
DeKalb County, IL
Built on Trust, Delivered with Results
Tammy Carson made a strong case to her school board for an Alpha-led energy project—publicly stating Alpha had “never let them down” in over 10 years. The result: a low-ROI ESSER-funded project tracking ahead of savings predictions.
BMO Center
Rockford, IL
Pardon Our Dust
This portion of the website is under construction, so please pardon our dust.


McLean County Unit District No. 5
Normal, IL
Pardon Our Dust
This portion of the website is under construction, so please pardon our dust.
Second Presbyterian Church
Bloomington, IL
Remote Monitoring, Real Savings
Second Presbyterian Church used to spend time every day adjusting HVAC settings manually. Now, they save energy automatically—with full visibility and remote access.


Frances L. Simek Memorial Library
Medford, WI
Pardon Our Dust
This portion of the website is under construction, so please pardon our dust.